• Alten Constuction Seeking Sub Bids for Davidson Middle School HAVC Upgrades

    • Share:
    April 26, 2021
    We are requesting sub bids and material quotes from Certified DVBE, LBE, DBE, MBE, WBE, SBE and all others for:

    Title: Davidson MS HVAC Upgrades
    Est. $4.1M
    Bid Date & Time: 5/10/21 @ 2PM
    Location: 280 Woodland Ave. San Rafael, CA 94901
    Owner: San Rafael City Schools


    SCOPE: Lease Leaseback Guaranteed Maximum Price Project. Alten Construction has been awarded this project to bid out to subcontractors. Scope is soft demo, limited hazmat abatement, sitework incl. minor excavation & concrete work for ext. mech. pads, fencing & gates for mech. Equip., rough carpentry, patching & replacing of int. and ext. finishes, mech. Equip. demo, mech. Equip. install, mech. controls, testing & balancing, electrical work to support new mech. equip., minor plumbing for mech. systems.

    Prevailing Wage Required / 5% Retention / Please see extracts from Owner Lease Agreements for General Construction Provisions – Special Conditions - Insurance Requirements - Liquidated Damages - Retention - 2 Year Warranty - Skilled & Trained Workforce Requirements / RFI Deadline is 5/3/21 by 5PM / MEP&FS Subs MUST be Prequalified / Trade Packages-Schedule-RFI Spreadsheet are to be provided via Bid Clarification / Non-Mandatory/ Pre-bid Site Visit is to be Announced
    • Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
    • It is now State of CA law to provide CSLB license #’s & DIR #’s on sub lists – make sure to have them on your bid scope!
    • Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project
    • Subcontractors & Suppliers are required to comply with Alten’s standard subcontract(s) which can be found on our website www.altenconstruction.com
    TRADES NEEDED (but not limited to): HazMat Abatement; Demolition; Water Distribution; Site Concrete; Concrete Reinforcement; Bldg Concrete; Structural & Misc Steel; Rough Carpentry; Finish Carpentry; Waterproofing; Roofing Repair; Sheet Metal Flashing; Joint Sealants; Doors, Frames & Hardware; Cement Plaster; Gypsum Board; Acoustical Ceilings; Painting; Plumbing; HVAC; BMS Controls; and Electrical.
    • Plans & Specifications are available for review and take-off in our office & free download on Procore.
    • Bid Coordinator: Karin Romeo x26 / Chief Estimator: Erik Andresen x15
    • Estimating Asst./Planroom Access: Bobby Alten x47
    • Phone: 1-510-234-4200 Fax: (Dial 1 + Area Code even from a 510 number) 1-510-234-4221
    • Email: bids@altenconstruction.com
    In order for bids to be considered, they must be received at our office by email, mail, phone or fax one half hour prior to bid closing time.
    • PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WKLY CERTIFIED PAYROLL RPTS SUBMITTED ON LCP TRACKER ARE REQUIRED. 100% PERFORMANCE & PAYMENT
    • BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM
    • PLEASE RESPOND TO EMAILED PROCORE INVITATION STATING WHETHER OR NOT YOU ARE BIDDING.TO REQUEST ACCESS TO PROCORE, EMAIL bids@altenconstruction.com OR CALL (510) 234-4200 x47.
    ALTEN CONSTRUCTION, INC IS AN EQUAL OPPORTUNITY EMPLOYER
    WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS

    Subcontractors & Suppliers are required to comply with Alten’s standard subcontract(s) which can be found on our website

    NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING; B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN’S DUTIES, TO BIDDER’S DUTIES TO ALTEN; AND C) THAT UPON ALTEN’S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN’S FORM SUBCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.
  • Newsletter Sign-Up

    Stay up-to-date on timely news, events, happenings, and more.

/*--to color bullets--*/